Website Quote Scoring Sheet for Charities and Nonprofits: A Simple RFP Scoring Matrix
Key takeaways
- The sheet scores nine criteria from 0 to 5 against weights that total 100, so each quote ends with one total out of 100.
- My suggested split is 60 points for understanding and governance, 20 for process, 10 for evidence and 10 for price: a starting point to adjust before any quote is opened.
- Price is scored last and by formula, as 5 times the lowest whole cost divided by this quote's whole cost, and only after every quote has been brought to the same scope and period.
- A score below 3 on ownership or on accessibility puts a quote out, and a low price cannot buy it back; the supplier can only return by changing its offer in writing.
- Paying for a website does not by itself transfer the copyright, because an assignment of copyright is not effective unless it is in writing and signed under section 90(3) of the Copyright, Designs and Patents Act 1988.
- Fix the weights before opening the quotes, score separately and then compare, and keep the finished sheet as the record of how the decision was reached.
Summary
A scoring sheet for comparing website quotes at a charity or nonprofit, to copy into a spreadsheet and use in a meeting. It gives nine criteria, a suggested weight for each, a 0 to 5 scale, and what a low and a high score look like. Price is scored by formula on the whole cost of the same scope, after everything else has been scored. A failing score on ownership or accessibility puts a quote out, however cheap it is. The weights are my recommendation and a starting point to adjust.
An RFP scoring matrix for a charity or nonprofit website is a table that scores every supplier's quote against the same weighted criteria, so you can show why you chose one. Copy the sheet below into a spreadsheet, adjust the weights, and fix them before you open any quote. It works the same whether you call it a request for proposals, a tender or three quotes.
This is general information, not legal advice, and I am not a solicitor. I checked each rule against the official source linked beside it on 5 November 2026. Rules change, so read the source before you rely on it, and take a solicitor's advice on a decision about your own organisation.
The weights and scoring bands are my recommendation, not a standard, so treat them as a starting point. I also quote for this work, so check them against what your own organisation needs. If you have not yet compared what each quote contains, start with the website proposal checklist.
The RFP Scoring Matrix Template: Criteria, Weights and Examples
| Criterion | Suggested weight | Score scale | A low score looks like | A high score looks like |
|---|---|---|---|---|
| Ownership and exit | 15 | 0–5, pass mark 3 | The supplier holds the domain, the code or the platform account. Ownership is not stated, or leaving carries a fee. | In writing: you own the bespoke work once it is paid for, with a lasting licence for anything reusable the supplier keeps. You hold the domain and have administrator access from the start. Handover carries no fee. |
| Accessibility | 15 | 0–5, pass mark 3 | "Built to best practice", an overlay plug-in, or one automated scan at the end. No standard is named. | WCAG 2.2 Level AA is the acceptance standard. Keyboard and screen reader testing happens during the build, you receive the results, and failures are fixed before you accept the site. |
| Understanding of your organisation and Board | 20 | 0–5 | Could have been sent to any client. Repeats your brief back and does not say who signs off what. | Names your audiences, what your funders look for and where your trustees decide. Challenges the brief where it is wrong, and says why. |
| Audiences and safeguarding | 10 | 0–5 | Treats everyone as "users", or treats people you serve as marketing material. | Says who comes first when audiences conflict, and how consent and removal work for people shown on the site. |
| Handover and written instructions | 10 | 0–5 | One training session at the end. What the site needs is known only to the people who built it. | Documentation is a listed deliverable with its contents stated. Written instructions stay with the site, so another supplier could pick it up. |
| Running the site after launch | 5 | 0–5 | Support is "as needed". You cannot tell who makes routine changes or what they cost. | Who makes which changes is clear, staff can make the ones you asked to keep, and response targets and notice periods are written down. |
| Data protection and security | 5 | 0–5 | No mention of personal data, or of where form submissions go. | Offers the written contract UK GDPR Article 28 requires where it processes personal data for you, lists the other services involved and says who applies updates. |
| Evidence and references | 10 | 0–5 | Screenshots and testimonials only. | Comparable nonprofit work with the reasoning explained, and a client you can call who has run the site since launch. |
| Whole cost | 10 | 0–5, by formula | Well above the lowest whole cost for the same scope. | The lowest whole cost for the same scope, which scores 5. |
The weights follow the split in my guide to selecting a website consultant through an RFP: 60 for understanding and governance, 20 for process, 10 for evidence and 10 for price. For a smaller commission, evaluate a consultant without an RFP instead.
The sheet does not choose a platform. If a quote offers a custom build, look for the three conditions in the governance verdict: a framework other developers know, a repository your organisation owns, written instructions in that repository for whoever works on it next.
What Each Score Means
Score what the quote says in writing. A promise made in a meeting counts once it is in writing.
| Score | What it means |
|---|---|
| 0 | Not addressed |
| 1 | Mentioned, with no detail |
| 2 | Some detail, with gaps you would have to close |
| 3 | A specific answer to what you asked |
| 4 | Specific, with evidence |
| 5 | Specific, with evidence, and the supplier agrees it goes in the contract |
Using the RFP Scoring Template in Excel or Google Sheets
Paste the first table into cell A1, so the criteria fill rows 2 to 10. Give each supplier a column from F onwards. These formulas assume three suppliers, in F, G and H, and work in Excel and Google Sheets.
| Row | What goes in it | Formula for column F |
|---|---|---|
| 2 to 9 | Your agreed score for each criterion | None, type the score |
| 10 | Price score | =5*MIN($F$11:$H$11)/F11 |
| 11 | Whole cost, in your currency | None, type the figure |
| 12 | Total out of 100 | =SUMPRODUCT($B$2:$B$10,F2:F10)/5 |
| 13 | In or out | =IF(OR(F2<3,F3<3),"Out","In") |
Copy the formulas across to G and H. When a supplier is out, clear its column, so its price cannot set the lowest figure for the others.
How a Charity Should Score Price
Price comes last, and it follows four rules.
- Score everything else first. Keep the cost pages aside until the other eight rows are scored. A low figure seen early colours every score after it.
- Bring every quote to the same scope. List what the fuller quote includes and the others leave out, then ask each supplier to price the missing items. The RFP guide has the method.
- Compare whole cost over one period. Add the build, the missing items, hosting, licences and support across the same length of time for every quote. Choose the length your Board expects the site to last.
- Let the formula set the score. The lowest whole cost scores 5, and a quote at twice that cost scores 2.5.
Decide before scoring whether you will consider a quote above your agreed budget. If a figure is far below the others, ask what it leaves out before you enter it. If a funder's grant terms set procurement rules, those rules come first.
Why a Nonprofit Cannot Buy Back a Failing Score
A cheap quote with no ownership terms can outscore a sound one on arithmetic alone. So two rows carry a pass mark of 3, and a score below it on either puts the quote out, whatever its total and whatever its price.
Ownership, because it is hard to recover after signing. Under UK copyright law, the author of a work is its first owner, with an exception for work an employee makes, and a supplier you commission is usually not your employee. An assignment of copyright is not effective unless it is in writing and signed by or on behalf of the person assigning it. So paying the invoice is not the same as owning the work, and the quote has to say what you will own.
Accessibility, because a legal duty can sit behind it, whatever a quote costs. In Great Britain, a charity providing a service to the public is a service-provider under section 29 of the Equality Act 2010, and the section applies a duty to make reasonable adjustments. The statutory code says that covers the voluntary sector and services on a website. Section 29 names no technical standard, so scoring against WCAG 2.2 AA is my recommendation. Elsewhere, check your own country's rules. What the build settles and what your team must keep doing sets out what to test.
A failing supplier may change its offer in writing before the contract. If the new wording reaches 3, the quote is back in.
Running the Scoring Meeting
- Fix the weights first. Agree them, and any change to the criteria, before a quote is opened. Changing them afterwards can look like choosing the winner.
- Declare links to suppliers. Anyone with a personal or financial tie says so before scoring. In England and Wales, the Charity Commission says a trustee with a conflict must tell the other trustees, and that a charity's rules should, as a minimum, have that trustee leave the discussion, stay out of the decision or vote, and not count in the quorum. Scotland and Northern Ireland have their own guidance.
- Score alone, then compare. Discuss only the rows where scores differ by 2 or more, then agree one score for each row.
- Keep the sheet. The Commission's guidance on trustee decision-making asks trustees to be sufficiently informed, take account of all relevant factors and manage conflicts of interest, and it explains how to record decisions. The completed sheet, with a sentence on why you chose as you did, goes in with the minutes.
Next step: once you have a preferred supplier, take its terms through the contract clauses a charity should ask for before anyone signs.
If you would rather settle the requirements before quotes go out, a Blueprint Audit is an independent assessment of the site you have. It is standalone work, and it sometimes concludes that nothing needs rebuilding.
Free download
Your website, for the board.
A two-page briefing you can fill in and put in the next board pack. It covers the six things funders check, how to see what AI tools say about you, and the options to put to trustees.
That did not send. Email hello@socialectric.com and we will send you the briefing. The spam check did not finish. Try again, or email hello@socialectric.com and we will send you the briefing.
Frequently asked questions
- What is an RFP scoring matrix?
A table that lists what you care about in a supplier, gives each item a weight, and scores every proposal against the same list. The weighted scores add up to one total for each proposal, so the discussion moves from which one people liked to where and why they differ. For a charity or nonprofit, it also leaves a written record of how the decision was reached.
- What are good RFP scoring criteria for a nonprofit website?
The nine in this sheet: ownership and exit, accessibility, understanding of your organisation and Board, audiences and safeguarding, handover and written instructions, running the site after launch, data protection and security, evidence and references, and whole cost. Portfolio sits inside evidence and carries no separate weight, because a good-looking site says little about what happens after launch.
- How much weight should price get when a charity compares website quotes?
I suggest 10 out of 100, because the sheet brings every quote to the same scope before scoring it, so cost differences have already been made comparable. A finance committee may want more, and that is its call. If you raise it, take the points from the criteria other than ownership and accessibility, agree the change before the quotes are opened, and keep the rule that a low price cannot buy back a failing score on either.
- Can a supplier that fails on ownership or accessibility still be chosen?
Only if it changes its offer in writing before the contract and then scores 3 or more on a fresh look at that criterion. Tell the supplier what the failing point was and let it respond. Its price alone cannot rescue the quote, and neither can a high total on everything else.
- How many people should score the quotes?
More than one, and each should score alone before anyone compares. Include someone who will live with the site and someone who answers to the Board. Anyone with a personal link to a supplier should say so first. The Charity Commission's guidance for England and Wales on conflicts of interest sets out what a trustee in that position must do, and I would hold staff who are scoring to the same standard.
- Does the highest total have to win?
No. The sheet informs the decision and those with authority to sign still make it. A small gap is a tie, and references can settle it. If you choose a lower total, write down why. A reason you can state in a sentence is a good reason, and one you would rather not write down deserves another look.